menu
RB JEROME BEL        performances
                      lutz förster (2009)
                                             technical rider
stage : 12 meters per 12 meters black marley dance floor
Black backdrop
Black side curtains at panorama position
transp
light : 2 to 3 rows of backlight to cover the whole stage
3 to 4 rows of front light to cover the whole stage without touching the backdrop
High sides to cover the whole stage
All lights are no colour
transp
sound : 4 monitors on stage mixing desk with 4 subgroups
1 CD-player
1 Lavalier microphone
1 SM 58 on a stand
The sound desk must be located in the audience
transp
props : 1 simple brown wooden chair without armrests (check the type of chair on the pictures available on our website www.jeromebel.fr, performances / lutz förster / pictures)
1 small table
transp
miscellaneous : the actor will smoke a cigarette on stage
transp
schedule and technical staff : 2 days before the performance : arrival of company’s technical director

Day before the first performance
9h00 - 13h00 : rigging lights, draperies and set-up sound
4 stage technicians, 3 light technicians, 1 sound technician

13h00 - 14h00 : lunch break

14h00 - 16h30 : focus light
3 light technicians, 1 stage technician

16h30 - 17h30 : programming and sound check
1 light technician, 1 sound technician, 1 stage technician

18h00 - 20h00 : rehearsal with light and sound
1 light technician, 1 sound technician, 1 stage technician

Day of the performance
For rehearsal and corrections as well as for the performance
1 light technician, 1 sound technician, 1 stage technician
transp
technical director : Thomas Wacker
Tel. : 0049 178 878 1416
Email : tomwacker@arcor.de
transp
rehearsal : A rehearsal and warm up room is required for Lutz Förster
transp
accomodation details :  Hotel with restaurant inside is required at a walking distance of the venue
A tub is required in the room of Lutz Förster
transp